Electronics assembly and development factory

Electronics assembly and development factory

Two of Walltopia’s manufacturing facilities are located in Letnitza, near Lovech in Bulgaria – a two-hour drive from the company’s headquarters in Sofia.

The plants were opened in 2010 with a total area of 6,000 m2 and have been extended to 10,000 m2 in 2012 and subsequently grew until reaching a total of 22,000 m2 with a capacity to produce more than 100,000 m2 of plywood panels per year.

Depending on the work load, there are around 200 full-time employees working at the factory.

Letnitza Steel is our Iron Shop where we do construction and assembly of steel frames with the capacity to process more than 1000 tons of steel per year. It is also the home of our pre-assembly workshop with lifting equipment and an impressive height of 25 meters. It allows pre-assembly of large structures and precision in manufacturing. This stage of the production process guarantees the quality in the final phase of each project and avoids any inaccuracies before they occur on the construction site.

Equipment & Specialized mechanization

Testing polygons

Electric trolleys that run on various tracks are being tested here. For the purpose real-life polygons indoor and outdoor are being built and components are being tested in their actual environment rather than virtual simulations.
Testing polygonsTesting polygonsTesting polygonsTesting polygonsTesting polygons

Electronic components R&D

A plant for development and testing new components.
Electronic components R&DElectronic components R&D

Crimping Machine

Up to 150 tons
Crimping Machine

Lathe

Lathe

Drilling and Milling

Drilling and MillingDrilling and Milling
To top